clinker grinding plant By Shanghai Minggong Heavy Equipment Co., Ltd.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
clinker grinding plant
Next

clinker grinding plant

75500 ~ 255000 / Set ( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

clinker grinding plant less than 5000tpd

Prix FOB:

75500 ~ 255000 / Set ( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

75500 per Set

Commande minimale:

1 Set

Packaging Detail:

big parts naked package, small parts wooden package

Heure de livraison:

90days

Capacité de Fournir:

35 Set per Year

Payment Type:

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Wei

No.33 Shenxia Road, Malu Industrial Park, Jiading District, Shanghai

Contacter maintenant

Spécification du produit

  • raw materials--one of the two largest steel factory in China:ISO9001:2008 And CE certificate
  • Senior Engineers & large workshop:engineer available for foreign installation and trial operat

La description

The Clinker is procured from Clinker Grinder Unit from India, China, Indonesia, Gulf and European counties. The mined Gypsum is available in local market. The additives are very important and vary with application of Cement. Generally, Slag of Iron Industry is used for making Slag Cement and Over Burnt Bricks / Fly ash from Thermal Power Plants are used to make Pozzolona Cement. The additive is selected on the basis of availability, economy and of course the demand of specialty Cement. All the raw materials are tested in laboratory for the quality before use.

All the raw materials are crushed with the help of Jaw Crusher if they contain lumps. The feed size for the Cement Mill should be less than 25 mm The raw materials are fed into their respective hoppers with the help of Belt Conveyor Or elevators. The hoppers are fitted with feeding systems which are connected with auto measuring and control system(Weighing Trolley). The measured quantity of raw material is discharged on a weighing Trolley/ conveyor belt. The weighing trolley/ conveyor belt carry the mixed material to the discharge hopper. The material from discharge hopper is taken to the elevator to feed into the Mill feed hopper. The discharge of the feed hopper is controlled by an adjustable speed rotary feeder. The feed of the mill can be varied as per the requirement. The rotary feeder discharge the material in to the Cement Mill. There are three chambers in the Mill. The chambers are filled with grinding Media ( balls & Cylpebs). The material is ground fine ( 3500 Cm2/gm.). The cement is discharged from the mill to the elevator to fill it in the Storage / Aeration Silo. The silo is fitted with compressed air coils. The air cools down the cement in the silo. The cooled Cement is packed with the help of packing machine in 50 Kg. Bags. The final product is tested from the bags for the quality and quantity and other parameters as per the statutory requirements provided by the Government.image

Pays: China
N ° de modèle: clinker grinding plant less than 5000tpd
Prix FOB: 75500 ~ 255000 / Set ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: 75500 per Set
Commande minimale: 1 Set
Packaging Detail: big parts naked package, small parts wooden package
Heure de livraison: 90days
Capacité de Fournir: 35 Set per Year
Payment Type: -
Groupe de produits : Complete Set of Cement Machinery

Mots-clés correspondants Shanghai Minggong Heavy Equipment Co., Ltd.

Send a direct inquiry to this supplier

To:

Mr. Wei < Shanghai Minggong Heavy Equipment Co., Ltd. >

Je veux savoir: