Prix FOB
Obtenir le dernier prix3000 ~ 50000 / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
1200A
Prix FOB:
3000 ~ 50000 / Set ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
3000 per Set
Commande minimale:
1 Set
Packaging Detail:
naked or by wooden cases
Heure de livraison:
within 10 days after down payment
Capacité de Fournir:
100 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter alisa
West Fourth Ring Road, Zhengzhou City, Zhengzhou, Henan
The wet pan mill is a new mill, small investment, high yield, the production cost is low, good benefits.
The wet pan mill is named by the diameter of roller. Φ***0,Φ ***0,Φ ***0,Φ ***0,Φ ***0 is suitable for selection of iron ore, molybdenum ore ,lead ore ,zinc ore, antimony ore and so on. Φ **0, Φ **0, Φ ***0,Φ ***0,Φ ***0 is suitable for selection of gold ore.
Â
As their small investment, high yield, the production cost is low, good benefits, praised by users, domestic alternative to the ball mill equipment. Grind gold machine easy installation and maintenance, small investment, high yield, quick, low-cost production, is the ideal equipment for mine SMEs beneficiation.
Â
Mainly used with gold, silver, lead, zinc, iron, molybdenum,
copper, antimony mine, mine, all ball mill can be selected
grind gold machine can be used. Characteristics: grind gold
through the raw material mixing, rolling, crushing, rolling
repeatedly reach moisture equilibrium ratio of uniform, low gas
content, improve the forming rate and forming quality, grind
the material through the machine molding Products with high
density, good strength, no porosity ratio weight. Energy
efficient, high volume of output, the product is used for iron
ore process tailings recovery, not to slag the loss of
effective resources can be fully utilized.
Â
Pays: | China |
N ° de modèle: | 1200A |
Prix FOB: | 3000 ~ 50000 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 3000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | naked or by wooden cases |
Heure de livraison: | within 10 days after down payment |
Capacité de Fournir: | 100 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | gold mining equipment |