Prix FOB
Obtenir le dernier prix100000 ~ 300000 USD / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
BL
Prix FOB:
100000 ~ 300000 USD / Set Obtenir le dernier prix
Localité:
Henan, China (Mainland)
Prix de commande minimale:
100000 per Set
Commande minimale:
1 Set
Packaging Detail:
electrical equipment are packaged by high quality plywood crates, main beams are packaged by plastic
Heure de livraison:
Shipped in 40 days after prepayment
Capacité de Fournir:
50 Set per Month
Payment Type:
Other, L/C, T/T
Groupe de produits :
Personne àcontacter Neil
Xinxiang, Henan
The unique China HSHCL **0 ton bridge
construction beam launcher equipment is designed for
subway project. According to the situation of present railway with
less subgrade, more bridges and tunnels which connected too
closely, our company design and manufacture the new and special
beam launcher. It is mainly used for lifting concrete girders in
bridge construction in general railway and highway
projects.
Â
This patented product is an excellent piece of equipment for
erecting Bridge Beams; whether steel or precast  concrete, any
shapes or sections, with curve or straight, with slope, skew or
super-elevation.Â
The Beam Launcher comes with centralize control system,
multi-speed Crane and Wagons, Hydraulic powered Support,
Mechanical powered Self Advancing system, and spare-parts.
Â
â–ª Crane traveling limit switch.Â
â–ª Overload protection device.Â
â–ª Lifting height limit device.Â
â–ª Voltage lower protection function .
â–ª Phase sequence protection function.Â
â–ª Emergency stop function.Â
â–ª Rain cover for outside hoist, driving units, electric
cubicle.Â
â–ª Warning indicator : flashing nights and warning
sounds.Â
â–ª Wire-less infra-detector for anti-collusion.
Our
Company
Henan
Shenghua Heavy Crane Group is a big enterprise specialized in
researching, developing, producing and
exporting.
It
mainly produces China HSHCL **0
ton bridge construction beam launcher equipment, launching
gantry crane, overhead crane and gantry crane, movable
scaffolding system crane, form traveler, straddle carrier, tyre
transporter, beam trolley, portal crane and electric winch,
electric hoist and all kinds of accessories, which widely cover
machinery, metallurgy, electric power, railway, water
conservancy, ports, terminals and other industries.
FAQ
1. Whats the information should I provide when inquiry about the China HSHCL **0 ton bridge construction beam launcher equipment?
a.we need the Bridge Drawing;the Maximum longitudinal slope and
the Maximum Transverse slope;
b.The Girder/beam drawing;
2. How
many Personnel and equipment to assemble launching gantry in
the worksite we need?
Personnel: 8 to *0 workers equipment
Truck crane > *0 t : 2 sets
Φ*9.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(*2 pound and 8 pound): 1 set for each
Wrench and pincher: severalÂ
Gradienter: 1 set
3. What
are inspection standard for load test of Beam launcher
cranes?
â—†Dynamic load test: 1.1 times rated load.
â—†Static load test: 1.*5 times rated load.
4. How
to make highway bridge concrete girders?
â—†Highway Bridge concrete girders could be made by 4
methods:
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.
5. How
about maintenance of Beam launcher cranes?
a. Lubricating:Working performance and service life of all
mechanisms of crane depend on lubricating to a big extent.
b. Steel wire rope:Fracture of wire has to be specially
noticed. A new steel wire rope has to be changed immediately
with the condition of broken wire, broken strands and wear loss
to scrapping standard.
c. Spreader: The spreader has to be checked regularly.
d. Pulley block:Mainly check rope race wearing condition, check
whether wheel flange is cracked and whether pulley could get
stuck in the axle or not.
e. Wheels:Regularly check wheel flange and tread, a new wheel
has to be immediately replaced as crack part or wearing in
wheel flange reaches *0% of wheel thickness;Re-polishing has to
be done as diameters between two driving wheels on tread
differs more than D/**0, or there are severe scar on the
tread.
f. Brake: Check one time per shift; The brake should be in
accurate movement, and pins do not allow to be stuck. Brake
shoes shall fit brake wheels correctly; the brake shoes
interval shall be equal to open them.
Pays: | China |
N ° de modèle: | BL |
Prix FOB: | 100000 ~ 300000 / Set Obtenir le dernier prix |
Localité: | Henan, China (Mainland) |
Prix de commande minimale: | 100000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | electrical equipment are packaged by high quality plywood crates, main beams are packaged by plastic |
Heure de livraison: | Shipped in 40 days after prepayment |
Capacité de Fournir: | 50 Set per Month |
Payment Type: | Other, L/C, T/T |
Groupe de produits : | Beam Launcher |