China Best Quality Grinding Equipment High Efficiency Energy Saving Vertical Mill By Chaoyang Heavy Machinery Manufacturing Co., Ltd.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
China Best Quality Grinding Equipment High Efficiency Energy Saving Vertical Mill China Best Quality Grinding Equipment High Efficiency Energy Saving Vertical Mill China Best Quality Grinding Equipment High Efficiency Energy Saving Vertical Mill China Best Quality Grinding Equipment High Efficiency Energy Saving Vertical Mill
Next

China Best Quality Grinding Equipment High Efficiency Energy Saving Vertical Mill

48576 ~ 308823 USD / Set

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

Model Number: LM0806

Prix FOB:

48576 ~ 308823 USD / Set Obtenir le dernier prix

Localité:

Chaoyang, China

Prix de commande minimale:

48576 per Set

Commande minimale:

1 Set

Packaging Detail:

Vertical mill packed in PP material foam outside or wooden box outside or customized.

Heure de livraison:

15-30 Days

Capacité de Fournir:

5 Set per Month

Payment Type:

Other, Western Union, L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Becky

Chaoyang, Liaoning

Contacter maintenant

Spécification du produit

  • Certification: ISO9001:Type: Ball Mill
  • Motor Type: AC Motor:Rotating speed: 62 r/min

La description

Application and Description:



According to different applications, there are three types of vertical mill: vertical coal mill, vertical slag mill and vertical cement mill.Vertical mill uses or adopts hydraulic pressure systembetween the materials onthe roller and disk to achieve the purpose of grinding.

Because of its high efficiency
, energy saving andstable capacity and yield, it iswidely used in cement, electric power, metallurgy, chemical industry, metal and nonmetal mines, and other industries.

Vertical mill can be used for processing
non flammable and explosive materials, with Mohs hardness below grade 8 and moisture less than *0%. Such asfeldspar, calcite, talc, barite, fluorite, rare earth, bentonite, marble, limestone, bauxite, manganese ore, phosphate ore, iron oxide red, quartz sand, cement clinker, activated carbon, clay, coal gangue, gypsum, silicon,slag,manganese ore, potassium feldspar.

Vertical milling
has a high efficiency. It can reduce ****0%energy cost compared with ball mill, and can dry *0%moistureof materials.The fineness of product is adjustable. And the size is uniform. It has simple operation,small footprint and convenient maintenance. It has low noisy and little dust when working. As the development of vertical mill, it is also used in medical and food.



Working Principle:



The grinding plate of vertical mill is driven by the motor through reducer. Material falls to the center of millstone and then move towards edge under the centrifugal force. Meanwhile it is rolled by roller. After crushing, material overflow from the edge, then it is transfered to the high efficient separator by hot air from nozzle ring. The bigger materials transmitted back to grinding and the qualified materials will be collected by the dust collecting system. The big materials that is not carried and metal parts entering accidentally will be ground through the external circulation of bucket.



Advantages in Technology and Performance:



1.Simple process, compactstructure and small construction area. Itcovers an areaabout *0% of ball mill. The building space is about *0%of ball millandcan be installed open air. Thatdirectly reduceinvestment. And the vertical millhas it own separator and does not need additional separator and elevator. Exit dust gas can be directly collected by bagdust collector or electric dust collector without air pollution.

2.Forthe material layer grinding principle, vertical mill reduce *0%**0% energy consumption compared with ball mill. And its electric power consumption is about *0%~*0% of ball mill.With the increase of materialsmoisture,electricity saving effect is more obvious.Vertical millhas no steel ball and impact liner inside, so the noise isverysmall,lowerthanball mill about*0 ~ *5dB.in addition, for using full closed system, vertical mill can work under the pressure without air pollution.

3.Equipped with auto-control system, our vertical mill can be long-distance controlled conveniently. By ways ofcheckingthe oil cylinder and turning the active arm, the roll sleeve and liner can be easily renewed,which canreduce the loss ofusers.

4.Theproducts ground by our vertical mill has a stablechemicalcomponent and uniform size,which be good for calcine. Materials invertical millremain only 2 ~ 3min when it is processed (which will last*5~*0min in ball mill), so its chemicalcomponent and fineness can quickly be measured and corrected. 

5.There is no direct contact between roller and grinding plate, so the abrasion is very small.The unit product metal consumption is generally 5 ~ *0g/t.



Maintenance & Attention:



1.The operatorof vertical mill should be fixed andhave a certainknowledge about the machine.Before the installation of vertical mill, the operator mustbe trainedto understandits workingprinciple and the operating procedures.



2.In order to make vertical mill service for a long time, the "equipment maintenance and safety operation system" shouldbemade. It is necessary to maintain tool, lubricate and other relative parts. Regularly checking the lubrication conditions and adding lubricatinggrease according tothe instructions. 



3.Feeding materials must not contain large pieces ofiron slag anddebris. Itwill not only increase theabrasionof grinding parts,but caused the blocking of millaffecting the mill output and continuous operation. Therefore, themetal detectors should beinstalled.



4.vertical mill should be check and maintenance after using a period time. Meanwhile, roller sleeve, mill liner and scraperplat should be repaired and replaced. Before and afterworking,connecting bolts and nuts should beexamine, to see whetherit is loose, lubricant is enough.



5.The rolling bearings in roller sleeve must be cleaned when changingthe roller sleeve and the grindingplate liner. Damaged parts should be replaced in time, andrefueling tools canuse manually pump and grease gun.



6.If you want to turn down the vertical mill, please stop feeding materials first. Stop the main motor and analyzer motor only after all materials in mill discharged out, about one minute after stop feeding.Then stop the fan motor at last,in order toblow powder all out.

Pays: China
N ° de modèle: Model Number: LM0806
Prix FOB: 48576 ~ 308823 / Set Obtenir le dernier prix
Localité: Chaoyang, China
Prix de commande minimale: 48576 per Set
Commande minimale: 1 Set
Packaging Detail: Vertical mill packed in PP material foam outside or wooden box outside or customized.
Heure de livraison: 15-30 Days
Capacité de Fournir: 5 Set per Month
Payment Type: Other, Western Union, L/C, T/T
Groupe de produits : mill

Send a direct inquiry to this supplier

To:

Becky < Chaoyang Heavy Machinery Manufacturing Co., Ltd. >

Je veux savoir: