Prix FOB
Obtenir le dernier prix0.3 ~ 5 /
|2000 Piece Minimum Order
Pays:
China
N ° de modèle:
brass pogo pin
Prix FOB:
0.3 ~ 5 / Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
0.3
Commande minimale:
2000 Piece
Packaging Detail:
PE bag packing(100pcs/PE bag) or according to customer requirements
Heure de livraison:
10-15 days after confirmed the sample
Capacité de Fournir:
500000 Piece per Month
Payment Type:
-
Groupe de produits :
Personne àcontacter Monica
Changan Town, Dongguan, Guangdong
   Item name |                             Data |
  Materials & Plating | Barrel:Brass,Beryllium copper,Phosphor Bronze |
Plunger:Brass,Beryllium copper,Phosphor Bronze | |
Spring:Stainless steel,Music wire | |
Plating:Gold,Silver,Palladium-Nickel | |
Flammability:UL*4Â V*0Â | |
Insulator:HTN,LCP,PBT | |
 |  |
Technical Specification | Rated Current:1A**0A(different structures)Â |
Rated Voltage:AC/DC *2V | |
Contact Resistance:*0mΩ Max. (stillness, Working stroke) | |
Operating Temp.**0°-**5° | |
Life test:**0,**0 ~1,**0,**0 | |
Reflow Temp.**5°, 4~5sec | |
 |  |
Environmental Test Standards | Salt spray test EIA******6 method B.Ka:*8h |
Humidity test EIA******1B method â…¡ condition A, *6h | |
Temperature cycling or thermal shock test EIA******2D method A condition:**0°***5,Five cycle | |
Temperature life test EIA******7B method-A condition*3 condition-A: *5°,*6h | |
Vibration test EIA******8E condition-â…¡,*0~**0Hz,*0g
acceleration shock time:*5 minites |
|
Mechanical shock test EIA******7B condition-A: *0g acceleration, triaxial six sides, each axis three times | |
Resistance to solder test EIA******6C condition-D level 2:**0°  *0s | |
Solderability test EIA******2: **5°, 5s | |
 |  |
     Certifications | ISO***0,QC*****0,ISO****1 |
ROHS,Reach,HF standards |
Pays: | China |
N ° de modèle: | brass pogo pin |
Prix FOB: | 0.3 ~ 5 / Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 0.3 |
Commande minimale: | 2000 Piece |
Packaging Detail: | PE bag packing(100pcs/PE bag) or according to customer requirements |
Heure de livraison: | 10-15 days after confirmed the sample |
Capacité de Fournir: | 500000 Piece per Month |
Payment Type: | - |
Groupe de produits : | pogo pin connector |