Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
Exporting Packing.
Heure de livraison:
materials deliver within 10 days after receiving t
Capacité de Fournir:
-
Payment Type:
T/T, L/C, Western Union
Groupe de produits :
-
Personne àcontacter suzy
Dongying, Shandong
Cementing Plug: when the drilling fluid make the
bottom plug move into the end, raised plum flower petal of the
bottom plug’s lower end engaging with the hollow plum flower petal
of float collar’s upper end. At the same time, the pressure rise,
when reach the definite pressure, the burst disk in the bottom plug
crush, the passageway open, and the pump pressure descent, at this
time can cementing. After cementing, pumping into the top plug to
clean cement slurry on the inner wall, the raised plum flower petal
of the top plug engaging with the hollow plum flower petal of the
bottom plug.
Â
suitable casing |
cementing plug |
|||||
top plug |
bottom plug |
plum flower petal or not |
suitable temperture |
|||
size |
D mm(inch) |
size |
D mm(inch) |
|||
7? |
PGT7 |
Φ**0 |
PGB7 |
Φ**0 |
yes |
**0°C |
**5/8? |
PGT**5 |
Φ**2 |
JS**5 |
Φ**2 |
yes |
**0°C |
***3/8? |
GT**9 |
Φ**5 |
PGB**9 |
Φ**5 |
yes |
**0°C |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Piece |
Packaging Detail: | Exporting Packing. |
Heure de livraison: | materials deliver within 10 days after receiving t |
Capacité de Fournir: | - |
Payment Type: | T/T, L/C, Western Union |
Groupe de produits : | - |