Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter Ms. Lihua
Xintang Industrial Area, Taizhou, Zhejiang
1. Mould Steel:
P*0, **8, ***8, H*3 etc.
 2. Injection System: Could Runner / Hot Runner
3. Lifetime of the Mould: **0,******0,**0
4. Production Time: *****0 days. We'll have the first test in
*****0 days, and *0 days later, after we finish the third mold test
and check the samples acceptable, we'll send one set of the sample
for your checking.
5. Mould schedule feedback: Feedback the mould course every half
month and attach picture of the mould.
6. When the mould has been completed, we will daub antirust oil on
mould surface or spray-paint according to customer's requirement.
Then put into wooden case with waterproof pellicle. Attached a bag
for mould spare parts: Assembly drawing of the mould, video of
mould test, a record report of mould test and inspection report of
sample.
Â
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | L/C, T/T |
Groupe de produits : | - |