Bridge Girder Launcher (900 ton) By Beijing Wowjoint Machinery Co.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Bridge Girder Launcher (900 ton)
Next

Bridge Girder Launcher (900 ton)

( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

900ton Launching Gantry

Prix FOB:

( Negotiable ) Obtenir le dernier prix

Localité:

P.R.China

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

sea worth packing

Heure de livraison:

6 months

Capacité de Fournir:

6 Set per Year

Payment Type:

L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Bruce

Dushi Industry Park, Songzhuang Town, Tongzhou District, Beijing, Beijing

Contacter maintenant

Spécification du produit

  • Brand Name: WOWJOINT
  • Rated Lifting Moment: 20m
  • Rated Loading Capacity: 1000tons
  • Span: 32m
  • Application: high speed railway,light railway, metro railway
  • Feature: Bridge Crane
  • Condition: New
  • Min. Bridge Radius:1400m
  • Surmountable Slope:3 %
  • Wind Speed:72km/h with load, 144km/h without load

La description

This machine can combine **0 ton tyre trolley to work for double-line high speed Railway Bridge with box beams in the length of *0m, *4m and *2m. 
 
1)Working environment and condition 
·Launching concrete box beam with same length span or different length span, with ballast or without ballast. 
·Different height of the concrete box beam in one bridge 
· Surmountable slope 3 % 
· Min. radius of the bridge ***0m 
·Wind speed: *2km/h with load, **4km/h without load. 
2)Main technical characteristics  
· When the launching gantry finishes placing concrete beams and the under bridge tries to launch forward,the whole machine is driven by the chain system of the small trolley under the launching leg. That can ensure a stable movement, and will never create additional force movement to the gantry. 
· When the location of machine assembly is close to the launching jobsite, the launching gantry can move to the abutment itself and can also place itself on the pier to be ready to erect concrete box beams. 
· After finishing erecting the concrete beam of one bridge, the launching gantry can move forward by itself on the deck or go through the existing deck or steel bridge. 
· With the help of special transporting frame, the launching gantry can be moved on the railway basement or deck by tyre trolley. 
·When it is necessary to go through certain areas with height limits or some narrow areas such as tunnels, the machine can be partly disassembled to reduce its section dimension. Then with the help of transporting the frame, the launching gantry can pass the limited area.  

Pays: China
N ° de modèle: 900ton Launching Gantry
Prix FOB: ( Negotiable ) Obtenir le dernier prix
Localité: P.R.China
Prix de commande minimale: -
Commande minimale: 1 Set
Packaging Detail: sea worth packing
Heure de livraison: 6 months
Capacité de Fournir: 6 Set per Year
Payment Type: L/C, T/T
Groupe de produits : Launching Gantry

Send a direct inquiry to this supplier

To:

Mr. Bruce < Beijing Wowjoint Machinery Co. >

Je veux savoir: