Prix FOB
Obtenir le dernier prix|
1 Unit Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Unit
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter Mr. Frank
shangjie, Zhengzhou, Henan
The bridge building crane for high speed railway uses full span method to construct bridge with span *0m,*4m and *2m, whole span girder weight **0t***0t, it is specially designed and made by ZZHZ .
Full span method means that girder carrier carries one whole span prefabricated box girder to the rear part of crane, then the bridge building crane lifts and puts it to the final position, and begins to install next span.
Main technical parameters
Product Model | HZQ**0 | HZQ**0 |
---|---|---|
Lifting Capacity (t) | **0 | **0 |
Max girder dimension(m) | *2.6×*3.4×3 | *2.6×8.4×3 |
Moving Speed (m/min) | **3 | **3 |
Trolley Moving Speed (m/min) | **3 | **3 |
Trolley lifting Speed (m/min) | **0.5 | **0.5 |
Trolley max lifting height(m) | 7 | 6.6 |
Girder transverse Trimming distance(mm) | ±**0 | ±**0 |
Girder Trimming speed(m/min) | **1 | **1 |
Tackle lifting weight(t) | *0 | *5 |
Min curve bridge radius(m) | ***0 | ***0 |
Power Required (kw) | **0 | **0 |
Out Dimensions (m) | *3.9×*3.5×*7.8 | *5.8×*1.*8×*1.8 |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Unit |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | L/C, T/T |
Groupe de produits : | - |