Prix FOB
Obtenir le dernier prix|
1 Plant Minimum Order
Pays:
Algeria
N ° de modèle:
From QFT4-15 to QFT18-20
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Plant
Packaging Detail:
cuntainer
Heure de livraison:
45 days
Capacité de Fournir:
200 Plant per Year
Payment Type:
L/C, T/T
Groupe de produits :
-
Algeria
Personne àcontacter Mr. Brahim
Economical Zone, Ghardaia, Other
The Block Making Machine with Fully
Automatic Production Line can realize the fully automatic
production process from material batching, mixing, forming,
drying and stacking, and its working principle is as follows:
1. The wheel loader feeds the course materials such as sand,
gravel to the batching machine, which will be weighed by the
electrical scale weighs;
2. The batched material will be fully automatic delivered to the
mixer through belt conveyor, and the fine materials such as
cement and fly-ash also will also be transferred to the mixer
fully automatic by screw conveyor;
3. The mixed materials will be delivered to the hopper of the
block making machine, and the material cart begins to charge
material into the surface of the mould box, then the squeeze head
drops down, it is by vibration and pressure to form blocks;
4. The green blocks on the pallets will move to the Elevator, the
son finger cart leave the mother finger cart to take them and go
back to the mother finger carts then moves back to the curing
room, and put these green blocks together pallets on the fixed
place in the curing room;
5. The finger carts also take the dried blocks with pallets to
the lower board conveyor for the cuber to clip them to the wood
rack on the finished goods conveyor, then we take the dried
blocks from the finished goods yard with forklift, and the empty
pallet on the lower board conveyor will come back to the pallet
storage for the next production.
Pays: | Algeria |
N ° de modèle: | From QFT4-15 to QFT18-20 |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Plant |
Packaging Detail: | cuntainer |
Heure de livraison: | 45 days |
Capacité de Fournir: | 200 Plant per Year |
Payment Type: | L/C, T/T |
Groupe de produits : | - |