Prix FOB
Obtenir le dernier prix25 ~ 100 / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
25 ~ 100 / Set ( Negotiable )Obtenir le dernier prix
Localité:
china
Prix de commande minimale:
25 per Set
Commande minimale:
1 Set
Packaging Detail:
box
Heure de livraison:
7
Capacité de Fournir:
1000 Set per Month
Payment Type:
T/T
Groupe de produits :
Personne àcontacter Ms. Joyce
No.286,ying bin road, bazhou city, hebei province ,china, Langfang, Hebei
Cat. No. | Rated Load (kN) | Construction | Weight (kg) |
CR***0 | *0 | Cast aluminum frame, aluminum (nylon) roller | 5.4/3.6 |
CR***1 | *0 | Steel tubing frame, aluminum (nylon) roller | 4.5/3.1 |
CR***2 | *0 | Steel tubing, long legs, aluminum (nylon) roller | 5.8/4.2 |
CR***3 | *0 | Steel plate base, aluminum (nylon) roller | 5.5/3.7 |
CR***4 | *0 | Steel tubing frame, aluminum (nylon) roller | 4.7/3.3 |
CR***5 | *0 | Steel tubing frame, aluminum (nylon) roller | 4.7/3.3 |
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 25 ~ 100 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | china |
Prix de commande minimale: | 25 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | box |
Heure de livraison: | 7 |
Capacité de Fournir: | 1000 Set per Month |
Payment Type: | T/T |
Groupe de produits : | cable roller |