Prix FOB
Obtenir le dernier prix2.15 ~ 3.25 / Square Meter
|1000 Square Meter Minimum Order
Pays:
China
N ° de modèle:
APP Modified Bitumen Waterproof Membrane
Prix FOB:
2.15 ~ 3.25 / Square Meter Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
2.15 per Square Meter
Commande minimale:
1000 Square Meter
Packaging Detail:
Packing with strips.
Heure de livraison:
10 days for one 20 feet container after received 3
Capacité de Fournir:
15000 Square Meter per Day
Payment Type:
T/T
Groupe de produits :
-
Personne àcontacter david
Rm403,chaolian Building B,No.838 in 105 National Road,Dashi street,Panyu,Guangzhou., Guangzhou, Guangdong
Detailed Product Description CE,ASTM Standarded manufacturer of
membrane wigth high quality and the best price roll
size:*0sqm/roll thickness:2.0mm~4.0mm
 APP Modified Bitumen Waterproof
Membrane
Description: DY-APP Modified Bitumen Waterproof
Membrane materials using polyester reinforcement for
waterproofing,it's made from polyester felt as its reinforcement
featuring high strength,elongation and corrision resistance,
APP,APAO as its modifier for meeting the torched-on applications,
it shall be covered with polyethylene membrane(PE),aluminium foil,
colorful sand or mineral granule on its top face and polyethylene
membrane(PE)coated on its under face. This series of membrane is
designed for the waterproofing of underground construction such as
tunnel, subway, basement ,roofs and pools etc.
 The special formulation of fire enables the membrane to be
applied directly with primer. This application is named as "Torched
on application".
APP Membrane installation procedure:
1.Base processing:the base surface must be clean,solid,level,dry;no
grit,rift and loosing dust. For a large recess,fill it with cement
mortar and then level it. Remove the protrusion and clean dust.If
working on base slab or lateral face,water lowering should be
done.
2. Painting primer:before laying the membrane,clean the dust on the
surface of concrete base with dust catcher or dust-blower;then
paint entirely with treatment agent of DY primer for
waterproofing(for purpose of dust consolidation and high adhesive
effect).
3.Heat to melt: place membrane correctly, fire torch, heat the
membrane with base entirely, when the surface of the membrane is
black and bright with a fusion layer, apply the membrane and press
it into a solid and flat state.Before the membrane is cool, seal
the edge of joint by float.
4.Requirements for lapping: There should be less than 3 layers of
lapping, with the joint seams appearing as"T" type,avoid
4 layers of lapping.The width of longitudinal lapping is between *0
and *0mm,and of end-lap joint **0mm.
 Package and transportation: 1. Membranes
should be stored under dry and ventilated conditions.
2. Different types of membranes must be piled separately.
3. Under usual condition, storage period is one year since
production date.
4. Membrane roll should be put vertically during transportation. It
should be kept away from sunshine and rainwater.
Requirements for surroundings:
1.The base should be dry and clean. Do not work in the rainy or
snowy day.
2.Do not work under heavy wind(above 5 grade)
3.Unsuitable for construction below 0°C 4.If it is rain or snow in
the process of construction, protective measure to the laid
membrane is must.
Pays: | China |
N ° de modèle: | APP Modified Bitumen Waterproof Membrane |
Prix FOB: | 2.15 ~ 3.25 / Square Meter Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 2.15 per Square Meter |
Commande minimale: | 1000 Square Meter |
Packaging Detail: | Packing with strips. |
Heure de livraison: | 10 days for one 20 feet container after received 3 |
Capacité de Fournir: | 15000 Square Meter per Day |
Payment Type: | T/T |
Groupe de produits : | - |