Prix FOB
Obtenir le dernier prix150 ~ 250 USD / Square Meter
|2000 Meter Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
150 ~ 250 USD / Square Meter Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
150 per Square Meter
Commande minimale:
2000 Meter
Packaging Detail:
as per custermor's request
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne à contacter Ms. Bella
Shijiazhuang, Hebei
Aluminum Alloy Template Department
of Boyang Corporation assimilates the manufacturing technologies
and processes of domestic and overseas aluminum alloy template
enterprises for years, always adheres to being market-oriented and
targeting satisfaction of customer demands, introduces and improves
aluminum alloy template products at home and abroad. Boyang
Corporation integrates international leading technology with
independent innovation, insists in proactive technological reserve
and occupies the dominant market position with advanced technology.
By perfect combination of state-of-the-art technology with
Made-in-China, Boyang Corporation specializes in development,
design, processing, leasing and subcontracting of aluminum alloy
template system products suitable for Chinas national conditions.
Boyang Corporation sticks to the philosophy of creating a new
generation of green construction technology, attaches importance to
environmental protection, utilizes energy in a circular and
economical way, elaborates aluminum templates and boosts the
promotion and popularization of aluminum alloy template in the
field of architecture together with developers and construction
enterprises, so as to create best economic and eco-friendly
benefits jointly.
Introduction of Aluminum Template
System
Material:****-T6
****-T6
Bearing capacity:*0KN/m2
Weight:****0kg/m2
Hardness:about *3webster
Color:silver white
Surface: coated by isolation
layer
Four Major Aluminum Template
Systems
Template System:
To constitute the closed surface desired for
concrete structure construction and ensure the forming of
construction structure in concrete pouring.
Accessory System:
To connect single pieces of templates into a
whole system, as connecting template member.
Support System:
To play a supporting role in the process of
concrete structure construction and ensure floors, beam bottoms and
cantilevered structures to be held steadily.
Fastening System:
To guarantee the width dimensions of
structured formed by templates and ensure no template deformation,
expansion or explosion in the process of concrete
pouring.
Products details
1. total system forms the complete concrete
structure
2. convenient
3. easy operation
4. high quality
5. light and great
flexibitity
6. durable, made of special alloy
aluminum
7. no need for rehabilitation, no risk of
rust and corrosion
8. fast installation owing to its special
design
9. speed of construction**-days each floor
construction cycle.
*0. Formwork can be re-used over **0
times.
*1. No tower cranes required to lift the
formwork from floor to floor, as the formwork is
lightweight.
System
Characteristics
System Characteristicshigh standardization,
lightweight, strong bearing capacity, high matching accuracy,
disassembly convenience, large plate surface, less joints, good
stability, long service life, more circulation times,
recyclability, good economic benefits and high recovery
value.
Analysis on Standard Five-day Construction
Period
1) Day 1:Measure, lay off, bundle wall
rebars and complete water and electricity performing and
embedding
2) *7:****2:*0 in Day 2:Remove wall boards
of lower level and transfer to the upper level for installation of
wall column template
3) *4:*0 in Day 2 - *8:*0 in Day 3:Remove
wall boards of lower level and transfer to the upper level for
installation
4) *7:****5:*0 in Day 4:Bundle beam rebars,
erect cantilevered structures for template construction, and adjust
and strengthen wall column templates
5) *5:*0 in Day 4 - *5:*0 in Day 5:Bundle
floor slab rebars and alternate water and electricity performing
and embedding
6) *5:****7:*0 in Day 5:Clean the floor,
recheck dimensions and prepare for concrete
pouring
7) *7:****3:*0 in Day 5:Concrete
pouring
Our Service
• Your inquiry related to our product &
price will be replied within *4hours.
• Well-trained & experienced staff are
to answer all your inquiries professional in English of
course.
• Working
time: 8:30am
-6:*0pm,
Monday to Friday.
• OEM is highly welcomed. We have strong
R&D team here to help.
• Your business relationship with us will be
confidential to any third party.
• Good after-sale service offered, please
get back if you got question
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 150 ~ 250 / Square Meter Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 150 per Square Meter |
Commande minimale: | 2000 Meter |
Packaging Detail: | as per custermor's request |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | L/C, T/T |
Groupe de produits : | - |