Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
-
Personne à contacter songjuan
Changsha, Hunan
1. Construction cycle is short, high efficiency
:Aluminum formwork system for the fast form
removal system, generally ****6 hours to form removal, so only one
layer of aluminum templates plus three single support can be used,
a layer of the normal construction of up to **4 days, thus greatly
shorten the construction period, the construction units to save
administrative costs, as well as real estate developers to shorten
the development cycle .
2. Reusable Low cost
: Regulate the construction of a template can be
flipped **0 times or more, use of low cost
3. Easy construction, high efficiency
:Aluminum formwork system assembly is simple,
convenient installation, simply pro rata increase the standard
board, light weight aluminum template per square meter ****5KG.
Construction process is completely assembled by hand,
transshipment; does not depend Lifting
Equipment
4. Good stability, high
capacity:capacity up to *0KN
5. Wide range of applications
: Aluminum formwork system is suitable for
all building components, such as load-bearing walls, columns,
beams, stairs, balconies, etc., are available through the cement
pouring at once .
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | - |