Prix FOB
Obtenir le dernier prix|
- Minimum Order
Pays:
China
N ° de modèle:
TARGE 1112
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
-
Payment Type:
-
Groupe de produits :
Personne àcontacter Mr. Johnny
Nanguo Industrial Zone, Wuxi, Jiangsu
processing Procedure 1. Method of Glue Water Mixture: Stir catalyzer, glue water and thinner evenly, at the rate of 1:*0:*0, then it in the material trough. 2. Feeds: Fill the glue water where the roller can touch it. 3.Baking: Firstly, adjust the temperature up to ****0 centigrade before starting the machine, and when the temperature shown in the thermometer reaches to *0 centigrade, readjust t it to about *5 centigrade, then start the machine. 4. Starting the machine: (1)Place the die to the machine head horizontally and fix it, then install the driving belt, and adjust the die. (2) Have the aluminum foil pass through the adhesive roller and drier, then start the machine; (3)Wrap the aluminum foil strip with steel wires, then weight it with heating installment, and adjust the rotating speed. 5. Quality Inspection: (1)Check whether the interval of the formed aluminum strip is the same. (2)Check whether there are steel wires out from cosmetic parts or inner parts.
Pays: | China |
N ° de modèle: | TARGE 1112 |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | - |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | - |
Payment Type: | - |
Groupe de produits : | spiral round tube equipment |