Prix FOB
Obtenir le dernier prix10 ~ 50 / Piece
|100 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
10 ~ 50 / Piece Obtenir le dernier prix
Localité:
China
Prix de commande minimale:
10 per Piece
Commande minimale:
100 Piece
Packaging Detail:
Strong plywood case with steel frame
Heure de livraison:
About 35 days after down payment received.
Capacité de Fournir:
500 Long Ton per Month
Payment Type:
T/T
Groupe de produits :
-
Personne à contacter Sherry
Suzhou, Jiangsu
Overall rolling fin is smooth and has no burr, so it is easy to clean. It is easy to make the fin surface wet and cooled with water when makes it cold during heating air-conditioning engineering. In the situation with drying, heating and other heat exchanging, its surface is handles by anodizing, which with beautiful color and luster, and can effectively prevent surface corrosion.
    Aluminum rolling finned tube is rolling as a whole by the aluminum tube, which has the feather that no contact thermal resistance, high strength, thermal shock and mechanical shock,  good thermal performance, and considerable expansion heat transfer surface. The heat exchanger with this kind of finned tube is ahead of the string or around the plate ones.
   According to user needs, we can produce all kinds of steel strip winding finned tube and steel aluminum composite finned tube.
   As the heat transfer element finned tube works long-term in high temperature and flue gas condition, such as finned tube in the boiler heat exchanger which use conditions are as high temperature and high pressure and corrosive atmosphere, should have a high performance metrics and they are as follows:
ã€Â Anti-corrosion   
    2)ã€Â Anti-wear  
    3)ã€Â lower contact resistance   
    4) ã€Higher Stability   
    5) ã€Anti-dust stratification
Â
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 10 ~ 50 / Piece Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | 10 per Piece |
Commande minimale: | 100 Piece |
Packaging Detail: | Strong plywood case with steel frame |
Heure de livraison: | About 35 days after down payment received. |
Capacité de Fournir: | 500 Long Ton per Month |
Payment Type: | T/T |
Groupe de produits : | - |