Prix FOB
Obtenir le dernier prix( Negotiable )
|100000 Meter Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
100000 Meter
Packaging Detail:
Export Details
Heure de livraison:
15-25 working days
Capacité de Fournir:
1000000 Meter per Week
Payment Type:
T/T, L/C
Groupe de produits :
Personne àcontacter Ms. Shirley
8Fl., The Place, 618 Xin Gang East Road, Haizhu District,, Guangzhou, Guangdong
*0*3 | *5*3.5 | *2*4 | *0*5 | *0*6 | *3*7 |
The new green building materials
Aluminum composite layer of five-layer structure
1)Health,
non-toxic, can be used for pure water,drinking water pipeline
system,the product is a green building materials
2) Due to the existence of the
middle layer of aluminum, the expansion co efficient of a small
metal pipe with considerable strength, toughness, imppact
resistance.
3) Corrosion-resistant, non-scaling;
may be waived and the basin was blocked pipes.the tub-shaped
macular rust.
4) High temperature,high pressure,
in the long-term work requirements under the pressure of piped
water temperature can reach*5°C.
5) Energy-saving insulation; thermal
conductivity of metal pipes1/**0 only, hot water pipe insulation
for excellent energy saving effect.
6) Light weight,high strength: the
proportion of only one-eighth of the metal.
7) Pleasing in appearance: products
both inside and outside the wall of smooth,flowing water yn force
small,soft colors. Beautiful graphics.
8) Can be buried, matal detectors
can be used to detect the location of the tube.
9) Install the
convenience,reliability: the use of hot melt connection,no sets of
silk. a few seconds to complete a joint connections, and matal
water pipes and connected to the use of high-quality copper insert,
safe and reliable.
*0) Long life: the piping system
under normal use life of up to *0 years.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 100000 Meter |
Packaging Detail: | Export Details |
Heure de livraison: | 15-25 working days |
Capacité de Fournir: | 1000000 Meter per Week |
Payment Type: | T/T, L/C |
Groupe de produits : | PPR Pipes |