Prix FOB
Obtenir le dernier prix|
1 Set Minimum Order
Pays:
China
N ° de modèle:
DN-25/35/50/75/100/150/200
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
According different model
Heure de livraison:
20 days
Capacité de Fournir:
50 Set per Month
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter Ms. Wendy
No 6, South Stadium Road ,YingCheng City ,HuBei Province ,China, yingcheng, Hubei
1.The special design of one body tube cylinder can guarantee the welding stability and velocity.
2.Efficient water cooling system make sure the possibility of long time working.
3.Spot and projection welding functions.
4.Computer control system with steady-voltage and current,Multi-time Discharge(MTD),can satisfy to various working
Primary technical parameters:
ltem  Model |
Rated capacity |
Rated primary voltage |
Rated frequency |
Maximum welding |
Rated duty cycle |
Arm length |
Maximum compression |
Electrode stroke |
Cooling water consumption |
Weight |
KVA |
V |
Hz |
KVA |
% |
mm |
N |
mm |
1/min |
Kg |
|
DN**5 |
 |
Pays: | China |
N ° de modèle: | DN-25/35/50/75/100/150/200 |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | According different model |
Heure de livraison: | 20 days |
Capacité de Fournir: | 50 Set per Month |
Payment Type: | L/C, T/T |
Groupe de produits : | - |