Prix FOB
Obtenir le dernier prix20000 ~ 35000 USD / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
5 ton per day copper smelter
Prix FOB:
20000 ~ 35000 USD / Set Obtenir le dernier prix
Localité:
Guangdong China
Prix de commande minimale:
20000 per Set
Commande minimale:
1 Set
Packaging Detail:
container
Heure de livraison:
20
Capacité de Fournir:
5 Set per Month
Payment Type:
T/T
Groupe de produits :
-
Personne àcontacter Liu
qingsan, Qingyuan, Guangdong
copper smelter plant, copper smelting process, copper furnace
Copper melting furnace composed by furnace top, furnace body and
furnace bottom. Top has a feeding port and exhaust port. Furnace
body has a number of air-holes on each side. Furnace bottom has
copper-out-hole and slag-out-hole.
Material of copper furnace is copper ore (oxidation ore, malachite
or sulfide ore), coke or PET coke for fuel, quartz and limestone as
flux. Material, fuel and flux are dropped into furnace, through the
furnace wall into the lower outlet of the drum the air to make coke
combustion, high temperature melting furnace charge, and a variety
of chemical reactions occur, producing matte (copper is about *0%)
/ blister copper (copper is about *0%) and slag, matte / blister
copper output formed copper ingots, while the slag discharged and
then refine.
Pays: | China |
N ° de modèle: | 5 ton per day copper smelter |
Prix FOB: | 20000 ~ 35000 / Set Obtenir le dernier prix |
Localité: | Guangdong China |
Prix de commande minimale: | 20000 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | container |
Heure de livraison: | 20 |
Capacité de Fournir: | 5 Set per Month |
Payment Type: | T/T |
Groupe de produits : | - |