Prix FOB
Obtenir le dernier prix|
1 Set Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
Standard packing
Heure de livraison:
In 35 days after get your advance payment
Capacité de Fournir:
40 Set per Month
Payment Type:
-
Groupe de produits :
-
Personne àcontacter Yolanda
Qingdao, Shandong
Application:Â For various electric vehicles, motorcycle tire curing, except man operated tire loading and removal, the entire curing process is automatic controlled.
Structure
Features:Â The machine is of side frame structure,
with two side boards harden into one integral upper and down
beams. The hot plate is placed between the upper and lower beams.
The whole machine is fixed stable with small noise and small
quantity of consumable parts. Electrical parts used linkage,
manual, single exchange system and PLC control system, which is
simple, safe and reliable.
Â
Â
Type |
YLL***0 |
YLL***0 |
YLL****0 |
Tyre Type |
wheelbarrow |
Motorcycle &bicycle |
Light truck |
Working layer |
4 |
4 |
4 |
O.D. of plate (mm) |
**0 |
**0 |
**0 |
Total pressure (KN) |
**0 |
**0 |
***0 |
Dia. of plunger (mm) |
**0 |
**0 |
**0 |
Steam working pressure (Mpa) |
0.**0.8 |
0.**0.8 |
0.**0.8 |
Electric control system |
PLC |
PLC |
PLC |
Overall dim.(LxWxH)(mm) |
***0x***0x***0 |
Â
 For FCL goods, we usually pack machines with stretched film and then load them to the container.
 For LCL goods, we usually pack machines with polywood boxes first, and then they will be transported to QINGDAO PORT by truck.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | Standard packing |
Heure de livraison: | In 35 days after get your advance payment |
Capacité de Fournir: | 40 Set per Month |
Payment Type: | - |
Groupe de produits : | - |