Prix FOB
Obtenir le dernier prix500000 ~ 700000 USD / Unit ( Negotiable )
|1 Minimum Order
Pays:
China
N ° de modèle:
SHX130-4.2/450-AII
Prix FOB:
500000 ~ 700000 USD / Unit ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
500000 per Unit
Commande minimale:
1
Packaging Detail:
Standard packing
Heure de livraison:
90 days
Capacité de Fournir:
100 Unit per Year
Payment Type:
D/P, D/A, L/C, T/T
Groupe de produits :
Personne à contacter SHAWN
Shanghai, Shanghai
*****0 T/H CFB Type Steam Boiler for Power
Plant
Welcome to Visit us in Shanghai China, or
inquiry more information from my
eamil: , or our
website: sinoboilers
. com
1) The Series of our Utility Boilers for 6MW, *2MW, *5MW power
station .
Parameter/Data/Type WB**5/3.**-M
WB**5/5.*-M WB***0/5.*-M
Rated evaporation capacity t/h
*5 *5 **0
Super heated steam outlet temperature
℃ **0 **5
**5
Super heated steam outlet pressure
MPa 3.*2 5.3
5.3
Rated Water-supply temperature ℃
**0 **0 **0
Fuel available Low quality soft coalã€coal
gangueã€lean coal Low quality soft coalã€coal
gangueã€lean coal Low quality soft coalã€coal
gangueã€lean coal
Boilers cylindrical central height level
mm ****0
****0 ****0
Boiler width(distance between columns)
mm ***0 ***0
***0
Boiler depth(distance between columns)
mm ****0
****0 ****0
Boiler cylinder mm
φ***0×*0 φ***0×*0
φ***0×*0
Number of separators 1
2 2
Type of separators Heat isolating
cyclone Heat isolating cyclone
Steam cooled cyclone
Type of feed back device
Non mechanic Non mechanic Non
mechanic
Type of cinders cooling device
Roller type water cooling Roller type water
cooling Roller type water cooling
lgnition mode
lgnition below water cooled airbed lgnition below
water cooled airbed lgnition below water cooled
airbed
Super heater temperature regulating mode
Nontontact afte mperator Nontontact afte
mperator Cooling by water spray
2) The simple introduction of **0MW class Circulating Fluidized Bed
(CFB) Boiler
• Main steam flow:**0~**0t/h
• Main steam outlet
temperature/pressure:**0℃/9.*1~*2.8MPa.g
• Feed water temperature:**0~**2℃
Technical features:circulating fluidized bed firing, M-type
arrang- ement, single furnace, without external bed heat exchanger,
single flue duct in the tail, cyclone separator, coal and limestone
feeding at front wall, bell-type air cap, upon -bed ignition,
roller ash cooler, etc.
Boiler advantages:extensive fuel adaptability range ( applicable
for firing petroleum coke, biomass fuel such as bark, widely used
in chemical and paper making industries ), high efficiency of
in-boiler desulphurization, low capital and operation cost, low NOx
emission, high combustion efficiency, excellent regulation features
for steam temperature, simple system configuration, high load
regulation ratio, comprehensive utilization of ash and
slag.
3) Design standard and selection scheme of main and auxiliary
equipment of boiler island
The scope of supply for each unit is as follows (taking CFB boiler
island project as an example):
S.N. System Main equipment
1 Boiler proper Steam drum, air
heater, soot blower, refractory material, cyclone separator, air
preheater
2 Coal feeding system Coal
silo, coal feeder, coal chute
3 Limestone system Limestone
silo, rotary feeder, bellows, limestone pipeline
4 Startup bed material system
Bed material silo, bucket elevator, bed material pipeline
5 Air/gas system Primary air
fan, secondary air fan, induced draft fan, high-pressure fluidized
air fan, air fan motor, fan silencer, air/gas duct
6 Oil firing system Start-up
burner, high-energy igniter, oil pipe, filter
7 Dedusting system Bag dust
collector
8 Desulphurization system
Absorption tower, process water tank, booster fan, limestone
slurry tank, filtrate tank
9 Denitration system Reactor,
pressure-stabilizing trough, ammonia evaporator, ammonia mixer,
dilution fan
Remark: All the systems and equipment listed in the table include
three parts, i.e. mechanical, I&C, and electrical parts.
4) Environmental protection products for power plants
Air Preheater (APH):
1. Adopted highly modular design scheme
2. Designed with perfect air leakage control measures
3. Reliability of equipment is at the leading position in
China.
4. Advanced research and development capability for the corrugation
of heat exchange element for air preheater
5. Pioneering in the denitration field
6. First-class operation achievements of quad-sector air preheater
for CFB boiler
Gas gas heater (GGH):
1. Reliable performance,,low resistance with certain margin of heat
exchange
2. Convenient installation and maintenance, reliable operation.
3. Low equipment leakage, varied control means.
4. Various selections of element's corrugation plate, ash clogging
resistance, easy cleaning.
5. Long service life.
6. Complete cleaning equipment.
7. Complete whole-set
High-temperature air preheater (HAP):
1. One only set of firing system needed.
2. Compact arrangement, continuous heat exchange.
3. Favorable for keeping furnace temperature and pressure constant
.
4. Low temperature fluctuation at heating elements, long life.
5. Favorable for improving quality of processed products.
6. Exhaust emission temperature lower than **0℃ possible.
7.Reliable operation and convenient maintenance.
Welcome to Visit us in Shanghai China, or
inquiry more information from my
eamil: shawn
Pays: | China |
N ° de modèle: | SHX130-4.2/450-AII |
Prix FOB: | 500000 ~ 700000 / Unit ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 500000 per Unit |
Commande minimale: | 1 |
Packaging Detail: | Standard packing |
Heure de livraison: | 90 days |
Capacité de Fournir: | 100 Unit per Year |
Payment Type: | D/P, D/A, L/C, T/T |
Groupe de produits : | Power plant boiler |