Prix FOB
Obtenir le dernier prix8 ~ 12 USD / Piece ( Negotiable )
|25 Piece Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
8 ~ 12 USD / Piece ( Negotiable )Obtenir le dernier prix
Localité:
Shenzhen
Prix de commande minimale:
8 per Piece
Commande minimale:
25 Piece
Packaging Detail:
-
Heure de livraison:
3-5 days for sample order;7-10 days for bulk order
Capacité de Fournir:
1000 Piece per Day
Payment Type:
T/T, Western Union, PayPal
Groupe de produits :
Personne àcontacter Mark
Fuyong, Shenzhen, Guangdong
 *8W **0cm T8 LED tube light Specification:
Power | *8W | LED Type | SMD***5 |
Power Supply | with Internal Power Supply | LED Q’ty | **0 PCS |
Input Voltage | AC*****5V *0/*0Hz | Lumen(lm)/LED | ****6lm |
Power Effect | 0.***0.*8 | Lumen (lm)/Tube | ********0 lm |
Material | AL + frosted or transparent PC | Light Effect | *****0lm/W |
Dimension(mm) | ***8mm(L)*Ø*8mm | CRI | >*0Ra |
Packing Size | ***0***0***0mm | CCT | *********0K |
Qty/Box | *5PCS | Beam Angle | **0° |
N.W/Tube | **0g | G.W/Box | *3.5KG |
ÂÂ
 Product Features:1.    With internal non-isolated power supply.
2.    Input: single-side or both-side .
3.    Using imported good quality aluminum material for better heat dissipation and maintaining long life span.
4.    Nice PC cover with good light transmission, ensuring *0% light transmittance, transparent and frosted PC covers are      available.
5.    Ambient temperature: **0℃~*5℃, Surface temperature: *2℃~*5℃
6.    Long life time, over *0 **0 hours
7.    No hazardous material, no flash, no buzz, completely RoHS and CE compliance
ÂÂ
ÂÂ
Dimension:ÂÂ
Application:Replace *0W fluorescent tube
Hotels
Conference / Meeting rooms
Factories & Offices
Commercial Purposes
Residential / Institution Buildings
Schools, Colleges & Universities
Hospitals
Places where energy saving and high color rendering index lighting
ÂÂ
Safety Notice for Using:Any maintenance should be performed by trained professionals only.
Keep packaging material away from the reach of children and pets.
Try to avoid looking directly in the LED beam-especially for extended periods of time.
Never cover the lights by other objects.
ÂÂ
Maintenance:Prior to cleaning the light, make sure it has been disconnected form the power supply
Use a dry of slightly moistened cloth for cleaning
Never use any chemicals of abrasives for cleaning
Disposal:Used electronic devices must be collected for recycling and cannot be deposited together with daily garbage.ÂÂ
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 8 ~ 12 / Piece ( Negotiable ) Obtenir le dernier prix |
Localité: | Shenzhen |
Prix de commande minimale: | 8 per Piece |
Commande minimale: | 25 Piece |
Packaging Detail: | - |
Heure de livraison: | 3-5 days for sample order;7-10 days for bulk order |
Capacité de Fournir: | 1000 Piece per Day |
Payment Type: | T/T, Western Union, PayPal |
Groupe de produits : | LED Tube |